Market Data Break Clearing - Approver

Top ↑

On this page, we will provide a description of the approval process for break clearing. This can start as soon as another user has started submitting proposed resolutions, after analysing identified breaks in a market data exception management (MD XM) workflow.

On this page, we will provide:

  • an overview of the approval process for market data break clearing
  • a description of the approval actions and corresponding permissible values, which apply to all break resolutions

Once breaks are resolved and approved, you can view and export the results of the exception management process, including raw, preliminary cleansed and overlay cleansed data (as described below), with the triggered breaks and corresponding resolution applied where applicable.

Overview

Once proposed resolutions have started being submitted in respect of identified market data breaks, you will need to:

  • check out the relevant approval task
  • at the task level, apply a (collective) approval action on selected MDKs with a break (as described below)

In case of rejection, the resolution process will need to be repeated. Given the nature of the two-stage MD XM workflow, you will not be able to approve your own proposed resolutions.

At the task level, the approval process will be as follows (similar to the resolution process):

  1. for each MDK with breaks, you can APPLY your validation or rejection of the proposed resolution either collectively (on all or on a sub-selection of filtered or explicitly selected items) or individually.(1)
  2. applied approval actions for selected items can be undone by clicking on RESET
  3. you can submit applied approval actions “as-you-go” by clicking on SUBMIT or CTRL+ENTER / CMD+ENTER on your keyboard (2)
  4. an approval task can be cancelled as a whole at any point by clicking on CANCEL (3)

(1) The status of the MDK with breaks will go from 'Waiting Approval' to "Waiting Submission" (or 'Rejected', where applicable).
(2) The task status will remain 'IN_APPROVAL' until all MDKs with breaks have been approved, at which stage, it will disappear from the live task list. If the resolution task is no longer live, it will be re-created with the status 'NOT_STARTED' for the rejected MDKs.
(3) The status of all MDK with breaks will revert back to 'Waiting Approval', and the task itself will revert back to 'PENDING_APPROVAL'.

Approval Task for Market Data Breaks

In this section, we will illustrate with a worked example how to approve market data preliminary break resolutions. The same process will apply to overlay break resolutions.

In our example, we had a preliminary market data break (Quantum test) that was resolved with the individual ‘Manual’ override action.

Under EXCEPTION MNGT/TASKS, in the MARKET DATA - PRELIMINARY PHASE window or in the MARKET DATA - OVERLAY PHASE window, you can view live preliminary and overlay break approval tasks for market data respectively (subject to the relevant task allocation permission).

Market data approval task
EXCEPTION MNGT/TASKS
Alt for image

Once proposed proposed resolutions have been submitted for approval, a different user to the resolver can check out a task by double-clicking on the line item or selecting a series of tasks and clicking on APPROVE.

Market data approval task check out
EXCEPTION MNGT/TASKS
Alt for image

The status of the selected clearing task(s) will go from ‘PENDING_APPROVAL’ to ‘IN_APPROVAL’ until completed, when it (they) will disappear from the live task list.

Market data approval task
EXCEPTION MNGT/TASKS/CLEARING
Alt for image

In addition to setting your preferred display configuration, you can:

  • view all or only MDKs with breaks (by clicking on either ‘ALL’ or ‘BREAKS ONLY’ in the data table)
  • filter and sort by Data Provider, Asset Class, Instrument Type, etc.

Supporting evidence can be uploaded prior to submission by clicking on UPLOAD.

A description of the approval scope and status and corresponding permissible values are set out in the table below.

After applying and submitting ‘VERIFIED’ as your approval action, the MD XM workflow should look like this:

Dashboard - XM Completed
EXCEPTION MNGT/DASHBOARDS/MARKET DATA DASHBOARD
Alt for image

If a resolution is rejected however, the task(s) will go back to (or be re-created with) the status of ‘NOT_STARTED’ in the resolver’s live task list panel.


Introduction to Xplain